One of the world's largest integrated gas processing terminals.

The natural gas joint development project (known as the In Amenas Gas Project) which includes four primary gas fields plus the gathering and processing facilities in Tiguentourine, 25 kilometres (16 mi) outside the town, was commissioned in 2006.

The project is operated by Sonatrach, BP, and Statoil.

MICROPACKcompleted a full fire and gas detection mapping study of the complete site using highly developed assessment methods together with our custom software FDA (Flame Detection Assessment), GDA ( Gas Detection Assessment) and HDA (Heat Detection Assessment) packages.

Micropack reviewed and assessed the existing arrangements and proposed additions and enhancements to the initial design. The assessments were then used to optimise the fire and gas detection system and provide a safe and cost effective design.

 

BP in Amenas

Working closely with clients’ needs, the methods we use combined, with real-world field experience, allows our consultants to optimize the design and achieve the best possible balance between safety and economy.

Review process

  1. Hazard Identification & a site-specific risk assessment.

  2. The philosophy is defined.

  3. Selecting the mapping technology.

  4. Analysing the site and calculating coverage

  5. Performance target review and a findings report.